How long does concrete patio lifting and repair take?
The polyurethane foam injection process typically requires a few hours. After the foam is injected under the concrete, it cures within 15 minutes.

Our Locations
Fairfield
2333 Courage Dr. Suite C
Fairfield, CA 94533
San Jose
1161 N Fair Oaks Ave
Sunnyvale, CA 94089
