Today we are off to Walnut Creek to level an interior floor that has experienced some settlement.  As you walk into the bathroom you can see that the floor is no longer touching the base board and there is a bowl effect or sloping floor issue in the immediate area.  After the structural engineer Cliff Tanaka assessed the situation by doing a floor evaluation survey it was determined that the perimeter foundation was level along with most of the interior floors but that the area around the bathroom had settled approximately 1-inch.  About 6 Simpson screw jacks are being installed to lift and re-level floors in this area.